By order of Fraport, Bickhardt Bau AG implements, in a consortium, the new construction of the taxiways W, W7, W9, R (partial), R17, S26, S24 and S23 for aircrafts with high live loads, in the south-western area of the airport ground. The total area of the new construction project, including conversion areas, is approximately 247,000 square metres. There are some existing taxiways which need to be renovated or modified. This building project includes underground engineering work for the construction of the paved areas, together with drainage and routes of the ductwork for cables.
Additionally, the employees of Bickhardt Bau AG renovate the existing taxiways R and S, together with the corresponding connections to the apron for aircrafts with high live loads. The surface area of the renovation measure amounts to 138,700 square metres.
The work tasks to be carried out are detailed in the text that follows: Demolition and removal of existing paved surfaces, building constructions and installations, earthworks, drainage channel construction, routes of the ductwork for cables with accessible manholes, aircraft movement areas with superstructures constructed using the concrete or asphalt method of construction, foundations for traffic signs and other signboards, marking work, gas and water pipes.
Earthworks:
Removal of 76,200 m³ of topsoil
110,000 m³ of soil movement, application and removal
Superstructure:
179,000 m² of asphalt pavements, up to 40 cm thick
25,500 m² of concrete pavements, 38 cm thick
Drainage:
7,430 m of reinforced concrete pipes DN 300 – DN 1800
1,294 m of reinforced concrete jacking pipes DN 300 – DN 1800 in underground pipe jacking
143 manholes made of prefabricated elements DN 1000 to DN 1500
9,254 m of drainage channels (designed to withstand the weight of wheeled vehicles)
Miscellaneous:
52,400 m² of demolition and removal work, regarding aircraft movement areas with installations
103 km of routes of cable protection tubes with accessible manholes