Kanalbau 3
Verlegung GFK-Pipeline DN 1600, Ticona Frankfurt-Höchst
-
Höchst Ticona1
Ticona Höchst, Bau der Versorgungsleitungen
-
Höchst Ticona2
Ticona Höchst, Bau der Versorgungsleitungen
-
Höchst Ticona3
Ticona Höchst, Asphaltierungsarbeiten, Platzbesfestigung
Almost 1000 people worked intensively on the new construction of one of the largest and most up-to-date plastics production facilities in the world: In the course of the expansion of the Frankfurt Airport, the company location of the plastics manufacturer Ticona was relocated from Kelsterbach to the industrial park of Höchst. Bickhardt Bau was entrusted with the construction of the drainage systems and supply pipelines as well as the roadways and paved places.
The building project was implemented under the highest safety standards which apply to the industrial park of Höchst and the building principal.
Earthworks:
60,000 m3 of soil movement
Drainage/channel:
3,320 linear metres of pressure pipe, HDPE, diameter DN 50 – DN 500
1,500 linear metres of glass fibre pipeline, diameter DN 1600
1,250 linear metres of heavy-duty gutters
Superstructure:
26,000 m2 of bituminous superstructure
8,500 m2 of water bound surface with a layer of crushed stone over compacted gravel